{"id":1489,"date":"2026-10-21T08:00:00","date_gmt":"2026-10-21T08:00:00","guid":{"rendered":"https:\/\/www.byqpower.com\/?p=1489"},"modified":"2026-10-16T03:29:24","modified_gmt":"2026-10-16T03:29:24","slug":"35-kv-power-transformer-project-guide","status":"publish","type":"post","link":"https:\/\/www.byqpower.com\/es\/35-kv-power-transformer-project-guide\/","title":{"rendered":"35 kV Power Transformer: Project Requirements and Buyer Decisions"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Tabla de contenidos<\/h2><nav><ul><li class=\"\"><a href=\"#make-the-selection-criteria-measurable\">Make the selection criteria measurable<\/a><\/li><li class=\"\"><a href=\"#translate-promises-into-deliverables\">Translate promises into deliverables<\/a><\/li><li class=\"\"><a href=\"#accessories-that-support-a-usable-installation\">Accessories that support a usable installation<\/a><\/li><li class=\"\"><a href=\"#an-inspection-baseline-for-long-term-maintenance\">An inspection baseline for long-term maintenance<\/a><\/li><li class=\"\"><a href=\"#tap-positions-and-voltage-regulation\">Tap positions and voltage regulation<\/a><\/li><li class=\"\"><a href=\"#turn-the-load-list-into-a-design-duty\">Turn the load list into a design duty<\/a><\/li><li class=\"\"><a href=\"#define-the-efficiency-measurement-boundary\">Define the efficiency measurement boundary<\/a><\/li><li class=\"\"><a href=\"#review-tests-and-design-evidence-before-production\">Review tests and design evidence before production<\/a><\/li><li class=\"\"><a href=\"#a-transparent-three-phase-screening-example\">A transparent three-phase screening example<\/a><\/li><li class=\"\"><a href=\"#compare-the-required-evidence-before-choosing\">Compare the required evidence before choosing<\/a><\/li><li class=\"\"><a href=\"#prepare-the-project-enquiry-and-approval-package\">Prepare the project enquiry and approval package<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">For a 35 kV power transformer, this guide examines configuration choices and project requirements. Use the following checks to prepare a project-specific specification, with operating assumptions and unresolved interfaces identified for engineering review.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/fenlei-5.jpg\" alt=\"Oil-immersed distribution transformer with a corrugated cooling tank\" class=\"wp-image-254\" srcset=\"https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/fenlei-5.jpg 800w, https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/fenlei-5-300x225.jpg 300w, https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/fenlei-5-768x576.jpg 768w, https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/fenlei-5-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"make-the-selection-criteria-measurable\">Make the selection criteria measurable<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A selection matrix for a 35 kV power transformer should begin with mandatory technical requirements. Identify voltage, duty, environment, interfaces and evidence that cannot be traded away for price. Then compare permissible alternatives using losses, maintainability, delivery and total installed cost. Assign a clear response for each requirement: compliant, deviating or awaiting clarification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask suppliers to submit deviations in one controlled schedule. Avoid comparing a fully documented offer with an inexpensive offer whose assumptions remain hidden. A useful matrix connects each claimed feature to a drawing or guarantee. Procurement can then discuss commercial tradeoffs without accidentally selecting a configuration that fails a basic project requirement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"translate-promises-into-deliverables\">Translate promises into deliverables<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The procurement file for a 35 kV power transformer should convert broad statements into dated deliverables. List approved drawings, inspection and test plans, test reports, packing documents and installation instructions. Ask which records are serial-number-specific and which are general design evidence. The contract should identify the review time and approval responsibility for each item.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Delivery dates should connect to drawing approval, purchased components and testing rather than an unexplained lead-time claim. Discuss the consequence of a delayed interface decision. Include spare parts and support terms explicitly. Website descriptions can guide questions, but only the agreed quotation and contract establish the commitments for the order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"accessories-that-support-a-usable-installation\">Accessories that support a usable installation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The accessory schedule for a 35 kV power transformer should explain each function and interface. Temperature indications, pressure devices, oil-level indications, terminal boxes and earthing points need locations and connection details. Separate an indication from an alarm contact and an alarm from a trip function. Procurement should identify which contacts are wired, which are spare and which are mapped to the site monitoring system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, check access with the transformer installed, including fences, bunds, adjacent cabinets and cable bends. A service valve facing a wall or an unreadable gauge creates a practical maintenance problem even when the electrical design is sound. Review the general arrangement alongside the civil layout and require the final documentation to reflect the shipped configuration.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"720\" height=\"405\" src=\"https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/huayu-factory-2.jpg\" alt=\"Transformer production workshop with rows of active parts\" class=\"wp-image-173\" srcset=\"https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/huayu-factory-2.jpg 720w, https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/huayu-factory-2-300x169.jpg 300w, https:\/\/www.byqpower.com\/wp-content\/uploads\/2026\/07\/huayu-factory-2-600x338.jpg 600w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"an-inspection-baseline-for-long-term-maintenance\">An inspection baseline for long-term maintenance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Commissioning records for a 35 kV power transformer create the reference against which later changes can be assessed. Maintain a serial-number-linked file containing approved drawings, test reports, protection settings and initial condition measurements. The equipment owner should establish inspection frequency using the manufacturer instructions, environment, load duty and applicable maintenance program. A universal calendar interval is rarely a sufficient plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, trend observations rather than treating each reading in isolation. A change in noise, loading, temperature or leakage may justify further investigation, but diagnosis requires context and qualified review. Record repairs, fluid work and accessory replacements in the same equipment history. The useful output is a traceable decision about condition and service, not a folder of unconnected readings.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"tap-positions-and-voltage-regulation\">Tap positions and voltage regulation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An off-circuit tap changer requires the operating conditions and isolation procedure specified by the manufacturer. An on-load tap changer is a different assembly with its own switching duty, controls and maintenance requirements. For a 35 kV power transformer, write the required regulation range, step size, control mode and permitted operating conditions rather than using the word adjustable as a complete specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, the utility voltage envelope and the required load-bus voltage should drive the tap discussion. Include seasonal network variation, feeder drop and any parallel-transformer arrangement. Decide who owns regulator settings and how local and remote commands interact. The delivery package should include a tap-position schedule that connects the physical mechanism, nameplate and control indications.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"turn-the-load-list-into-a-design-duty\">Turn the load list into a design duty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sizing a 35 kV power transformer begins with the loads that can operate together. Record demand, power factor, duty cycle, starting events and planned expansion. Separate connected nameplate power from coincident operating demand. Use measured data where available and identify assumptions for new facilities. A blanket diversity factor can hide a critical operating event if the load schedule is not understood.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, build normal, peak and contingency cases as separate rows. Include temperature and cooling restrictions alongside electrical demand. Check each case with the selected equipment and system study. The purpose is to identify the limiting condition, which may be current, voltage drop, thermal duty, fault rating or available energy rather than the largest total in a load list.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"define-the-efficiency-measurement-boundary\">Define the efficiency measurement boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An efficiency comparison for a 35 kV power transformer starts with the measurement boundary, operating point and included losses. For transformers, compare guaranteed no-load and load losses at compatible reference conditions. For storage, distinguish DC and AC boundaries and account for auxiliaries. For assemblies, ask for measurable electrical or thermal information instead of an unsupported efficiency label.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, request the test or calculation method behind each value. Do not compare a best-case point with an annual operating estimate or a gross value with a net value. Record load level, power factor, temperature and cooling state where relevant. The result should explain how the equipment behaves under the project duty rather than only advertise a favorable percentage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"review-tests-and-design-evidence-before-production\">Review tests and design evidence before production<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a 35 kV power transformer, the inspection plan should connect manufacturing stages to acceptance evidence. Establish material records, in-process checks and final tests with appropriate hold or witness points. Distinguish a test facility capability from a commitment to perform a particular test on the ordered unit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the review of a 35 kV power transformer, agree the treatment of nonconformities and design changes. The buyer should know when approval is required and what supporting evidence accompanies a proposed correction. Final reports should identify the serial number and test conditions. An audit becomes useful when it leads to a clear inspection and documentation plan for the actual order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"a-transparent-three-phase-screening-example\">A transparent three-phase screening example<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a hypothetical 1250 kVA, 35\/0.4 kV three-phase configuration, nominal line current is I = S \/ (\u221a3 \u00d7 V). The calculated currents are about 20.6 A on the 35 kV side and 1,804.2 A on the 0.4 kV side. The lower voltage is an explicit example assumption unless it appears in the approved data sheet. These figures help frame a discussion of a 35 kV power transformer; they are not a Huayu product test result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At an illustrative 65% apparent-power loading and 0.90 power factor, active output would be 1250 \u00d7 0.65 \u00d7 0.9 = 731.25 kW. That does not determine a permissible overload or establish thermal suitability for a 35 kV power transformer. Review temperature, cooling, waveform, voltage behavior and contingency conditions separately. Replace the example values with the approved system data before selecting cables, protection or a final configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-the-required-evidence-before-choosing\">Compare the required evidence before choosing<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Decision for a 35 kV power transformer<\/th><th>Compare on the same basis<\/th><th>Pruebas para solicitar<\/th><\/tr><\/thead><tbody><tr><td>Electrical duty<\/td><td>kVA, voltage ratio, frequency and connection<\/td><td>Approved data sheet and single-line diagram<\/td><\/tr><tr><td>Thermal duty<\/td><td>Cooling stage, losses and ambient conditions<\/td><td>Guaranteed values and thermal basis<\/td><\/tr><tr><td>Installation<\/td><td>Outline, terminals, mass and access<\/td><td>General arrangement and site layout<\/td><\/tr><tr><td>Acceptance<\/td><td>Tests and permitted deviations<\/td><td>Inspection plan and serial-number-linked reports<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"prepare-the-project-enquiry-and-approval-package\">Prepare the project enquiry and approval package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a 35 kV power transformer, review the <a href=\"https:\/\/www.byqpower.com\/es\/producto\/transformador-de-potencia-sumergido-en-aceite-de-2000kva-35kv\/\">Transformador de potencia con inmersi\u00f3n en aceite de 2000 kVA 35 kV<\/a> catalogue entry and the <a href=\"https:\/\/www.byqpower.com\/es\/solucion-de-distribucion-de-energia\/\">related power solution<\/a>. Request a configuration-specific response; a family illustration does not establish the parameters of a customized unit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/588\" target=\"_blank\" rel=\"noopener\">IEC 60076-1 power transformer scope<\/a> supports the technical scope discussion for a 35 kV power transformer. It is a reference, not a claim of product certification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Send the 35 kV power transformer data sheet, single-line diagram, operating profile, location and delivery requirements to the <a href=\"https:\/\/www.byqpower.com\/es\/contactanos\/\">Huayu enquiry team<\/a>. Ask for rated values, a deviation schedule and the agreed acceptance documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-question-004-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed to assess a 35 kV power transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>For a 35 kV power transformer, provide the load or source profile, voltage, frequency, operating modes and installation conditions. Include a single-line diagram and the required acceptance basis. The supplier can then review a specific configuration and identify missing inputs rather than assume that a catalogue label defines the duty.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-004-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which operating conditions should be defined for a 35 kV power transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>A selection matrix for a 35 kV power transformer should begin with mandatory technical requirements. Identify voltage, duty, environment, interfaces and evidence that cannot be traded away for price.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-004-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should the supply scope for a 35 kV power transformer include?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The procurement file for a 35 kV power transformer should convert broad statements into dated deliverables. List approved drawings, inspection and test plans, test reports, packing documents and installation instructions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-004-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What installation and delivery information is needed for a 35 kV power transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The accessory schedule for a 35 kV power transformer should explain each function and interface. Temperature indications, pressure devices, oil-level indications, terminal boxes and earthing points need locations and connection details.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-004-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What access and maintenance records are needed for a 35 kV power transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Commissioning records for a 35 kV power transformer create the reference against which later changes can be assessed. Maintain a serial-number-linked file containing approved drawings, test reports, protection settings and initial condition measurements.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"Suscribirse\">\n                    Suscribirse                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1489' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"e5f6e93a67\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/es\/wp-json\/wp\/v2\/posts\/1489\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nombre\">Nombre<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nombre\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"Correo electr\u00f3nico\">Correo electr\u00f3nico<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"Direcci\u00f3n de correo electr\u00f3nico\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"Tel\u00e9fono\">Tel\u00e9fono<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"Tel\u00e9fono\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Tu mensaje\">Tu mensaje<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Tu mensaje\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Enviar formulario\">Enviar formulario<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"es\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/www.byqpower.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>For a 35 kV power transformer, this guide examines configuration choices and project requirements. Use the following checks to prepare a project-specific specification, with operating assumptions and unresolved interfaces identified for engineering review. Make the selection criteria measurable A selection matrix for a 35 kV power transformer should begin with mandatory technical requirements. Identify voltage, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":254,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"35 kV power transformer: Buyer Guide","rank_math_description":"Assess a 35 kV power transformer with practical project requirements, duty checks and procurement evidence. Prepare a clearer enquiry for Huayu.","rank_math_canonical_url":"https:\/\/www.byqpower.com\/35-kv-power-transformer-project-guide\/","rank_math_focus_keyword":"35 kV power transformer"},"categories":[23],"tags":[],"class_list":["post-1489","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/posts\/1489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/comments?post=1489"}],"version-history":[{"count":1,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/posts\/1489\/revisions"}],"predecessor-version":[{"id":1659,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/posts\/1489\/revisions\/1659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/media\/254"}],"wp:attachment":[{"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/media?parent=1489"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/categories?post=1489"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.byqpower.com\/es\/wp-json\/wp\/v2\/tags?post=1489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}